Categories
Contact Us
3. What are the precautions for safe operation of the test?
◆ The equipment must have a good ground, the mainframe of the testing machine, the control board and the computer shell must be a common ground between the test machine, in the insertion and removal of the test machine connecting lines, to be carried out in the case of power failure. ◆ In the event of failure, if necessary to open the control system shell, you must first turn off the main power switch (non-professionals do not open the upper cover, there is a high-voltage danger). ◆ During the
4. Electronic universal testing machine software system hardware requirements?
The computer configuration requirements for our software are as follows: CPU: PIII 500 or above; Memory: at least 2G; Hard disk: at least 100G of remaining space; Optical drive: 40X or above CD-ROM, or 16X DVD-ROM; Graphics card: support at least 1024 x 768 resolution, and graphics memory greater than 2G; Monitor: 19-inch CRT monitor or above. Mouse: need to have a scroll wheel, preferably an optical mouse. Windows 7 or higher and Microsoft Office 2010 or higher should be installed.
5. Tester software system hardware requirements?
If your computer was supplied to you by our company with the tester, the software is usually already installed. In the following two cases, it is necessary for the user to install the software by himself: (1) The user's own computer is equipped with the software; (2) The software is not working properly due to an error. Self-installation of the software steps can refer to the Division I random file “software instruction manual”.
6. Hardware parameter setting problem?
Setting the parameters of each sensor does not allow the user to change them without authorization, otherwise it may lead to abnormalities. Once modified and saved, it must be recalibrated.
7. Electronic high-temperature persistent creep tester preparatory work
◆ Check that the connectors of the measuring instruments such as electric couplings and deformations on the main unit are connected properly. ◆ Prepare the test specimen and measure its dimensions. ◆ Check whether the fixture installed meets the test requirements of the test specimen. ◆ Check whether the power supply is connected. Turn on the power of the main unit, place the lower tie bar fixture on the force sensor and zero the force value. ◆ Install the upper and lower tie bar fixtures, speci
8. Electronic high temperature persistent creep tester to meet the downtime conditions are?
Persistence: rupture or specified loading time; Creep: the test is automatically completed after fracture, a specified loading time or a specified creep deformation.